空壓機(ji)的停用(yòng)在各個(gè)單位都(dōu)常有發(fa)生。那麼(me)在初次(cì)開機前(qian)📧空壓機(ji)停放時(shi)間超過(guò)三個月(yuè)或空壓(yā)機停用(yòng)時間超(chao)過三個(ge)月,再次(cì)開機前(qián)需要采(cǎi)取有效(xiao)措施,bi須(xū)先請專(zhuān)✨業空壓(ya)🚩機人員(yuán)對機器(qi)進行保(bǎo)養檢測(ce),制定安(ān)🌈全措施(shī),避免開(kāi)機後發(fa)生不良(liang)狀況。
The shutdown of air compressors often occurs in various units. Then, before the first start-up, the air compressor parking time is more than three months or the air compressor parking time is more than three months. Before the second start-up, effective measures need to be taken. The Bi must first ask professional air compressor personnel to carry out maintenance and inspection of the machine, and formulate safety measures to avoid adverse conditions after the start-up.
1、先(xian)檢查電(diàn)路狀态(tai),是否正(zhèng)常供電(dian),電壓是(shi)否穩定(ding);測🤟量電(dian)動機絕(jué)緣電阻(zu),數值大(da)于1MΩ。
1. Check the state of the circuit first, whether the power supply is normal, whether the voltage is stable; Measure the insulation resistance of the motor, the value is greater than 1M.
2、檢查(cha)空壓機(ji)配件上(shàng)是否含(han)有積水(shuǐ),灰塵,及(jí)時清理(lǐ)。
2. Check whether there is water and dust on the spare parts of air compressor, and clean them up in time.
3、對進氣(qì)口,出氣(qi)口全面(miàn)檢測,防(fáng)止發生(sheng)堵塞現(xian)象
3. Overall inspection of intake and outlet to prevent blockage
4、在上(shang)述都已(yi)經完成(chéng)的情況(kuàng)可以接(jiē)通電源(yuan),查看電(dian)🏃♀️腦控制(zhì)器是否(fǒu)正常運(yun)行
4. If all the above have been completed, the power supply can be connected to check whether the computer controller is working properly.
5、更換(huàn)三濾和(he)潤滑油(yóu)。因為在(zài)長期不(bu)用的情(qíng)況下,三(san)濾,油可(kě)能☀️發生(shēng)老化現(xiàn)象,從而(er)造成空(kong)壓機開(kai)機運行(háng)時間不(bú)長即結(jié)膠🈲積碳(tan)或堵塞(sai),油路不(bú)暢使空(kōng)壓機主(zhu)機或其(qi)他零部(bù)件📞損壞(huai)。
5. Replace three filters and lubricants. Because in the case of long-term non-use, three filters may cause oil aging phenomenon, which causes the air compressor start-up time is not long, that is, cementing carbon deposit or blockage, oil circuit is not smooth, so that air compressor main engine or other parts are damaged.
6、專業人(ren)員試機(jī),電路改(gai)造後人(rén)工控制(zhi)加載卸(xie)載,先空(kong)載運🔴行(háng)💯10分鐘以(yǐ)上,檢測(ce)各項指(zhǐ)标和震(zhèn)動、噪音(yin)等正常(cháng),再進行(hang)加載,查(chá)看各🚶部(bu)件運行(háng)正常即(jí)可。
6. Professional personnel test machine, after circuit modification, manual control loading and unloading, first no-load operation for more than 10 minutes, detection of various indicators and vibration, noise and other normal, then load, check the normal operation of the components.