18857002497
空(kong)壓機長期停放(fàng)注意事項
空壓機的停用(yong)在各個單位都(dōu)常有發生。那麼(me)在初次開機前(qian)空壓機停放時(shí)間超過三個月(yuè)或空壓機停用(yòng)時間超過三個(gè)月,再🏃次開機前(qián)需要采取有效(xiào)措施,bi須先請專(zhuān)業空壓機人員(yuán)對機器進行保(bǎo)養檢測,制定安(an)全措施,避免開(kāi)機後發生不良(liang)狀況。
The shutdown of air compressors often occurs in various units. Then, before the first start-up, the air compressor parking time is more than three months or the air compressor parking time is more than three months. Before the second start-up, effective measures need to be taken. The Bi must first ask professional air compressor personnel to carry out maintenance and inspection of the machine, and formulate safety measures to avoid adverse conditions after the start-up.
1、先檢查電(diàn)路狀态,是否正(zheng)常供電,電壓是(shì)否穩定;測量🐪電(diàn)動機絕緣電阻(zǔ),數值大于1MΩ。
1. Check the state of the circuit first, whether the power supply is normal, whether the voltage is stable; Measure the insulation resistance of the motor, the value is greater than 1M.
2、檢查(cha)空壓機配件上(shang)是否含有積水(shui),灰塵,及時清理(li)。
2. Check whether there is water and dust on the spare parts of air compressor, and clean them up in time.
3、對進氣口,出氣(qì)口全面檢測,防(fáng)止發生堵塞現(xian)象
3. Overall inspection of intake and outlet to prevent blockage
4、在上述都已(yi)經完成的情況(kuang)可以接通電源(yuan),查看電腦控制(zhì)器是否正常運(yùn)行
4. If all the above have been completed, the power supply can be connected to check whether the computer controller is working properly.
5、更換三濾和(he)潤滑油。因為在(zài)長期不用的情(qíng)況下,三濾,油🏃可(ke)❌能發生老化現(xian)象,從而造成空(kōng)壓機開機運行(hang)時間不長即☁️結(jié)膠積碳或堵塞(sai),油路不暢使空(kōng)壓機主機或其(qi)他零部件損壞(huai)。
5. Replace three filters and lubricants. Because in the case of long-term non-use, three filters may cause oil aging phenomenon, which causes the air compressor start-up time is not long, that is, cementing carbon deposit or blockage, oil circuit is not smooth, so that air compressor main engine or other parts are damaged.
6、專業人員試機(jī),電路改造後人(rén)工控制加載卸(xiè)載,先空⚽載運行(hang)🌈10分鐘以上,檢測(ce)各項指标和震(zhen)動、噪音等正常(cháng),再進💜行加載,查(cha)看各部件運行(háng)正常即可。
6. Professional personnel test machine, after circuit modification, manual control loading and unloading, first no-load operation for more than 10 minutes, detection of various indicators and vibration, noise and other normal, then load, check the normal operation of the components.
The shutdown of air compressors often occurs in various units. Then, before the first start-up, the air compressor parking time is more than three months or the air compressor parking time is more than three months. Before the second start-up, effective measures need to be taken. The Bi must first ask professional air compressor personnel to carry out maintenance and inspection of the machine, and formulate safety measures to avoid adverse conditions after the start-up.
1、先檢查電(diàn)路狀态,是否正(zheng)常供電,電壓是(shì)否穩定;測量🐪電(diàn)動機絕緣電阻(zǔ),數值大于1MΩ。
1. Check the state of the circuit first, whether the power supply is normal, whether the voltage is stable; Measure the insulation resistance of the motor, the value is greater than 1M.
2、檢查(cha)空壓機配件上(shang)是否含有積水(shui),灰塵,及時清理(li)。
2. Check whether there is water and dust on the spare parts of air compressor, and clean them up in time.
3、對進氣口,出氣(qì)口全面檢測,防(fáng)止發生堵塞現(xian)象
3. Overall inspection of intake and outlet to prevent blockage
4、在上述都已(yi)經完成的情況(kuang)可以接通電源(yuan),查看電腦控制(zhì)器是否正常運(yùn)行
4. If all the above have been completed, the power supply can be connected to check whether the computer controller is working properly.
5、更換三濾和(he)潤滑油。因為在(zài)長期不用的情(qíng)況下,三濾,油🏃可(ke)❌能發生老化現(xian)象,從而造成空(kōng)壓機開機運行(hang)時間不長即☁️結(jié)膠積碳或堵塞(sai),油路不暢使空(kōng)壓機主機或其(qi)他零部件損壞(huai)。
5. Replace three filters and lubricants. Because in the case of long-term non-use, three filters may cause oil aging phenomenon, which causes the air compressor start-up time is not long, that is, cementing carbon deposit or blockage, oil circuit is not smooth, so that air compressor main engine or other parts are damaged.
6、專業人員試機(jī),電路改造後人(rén)工控制加載卸(xiè)載,先空⚽載運行(hang)🌈10分鐘以上,檢測(ce)各項指标和震(zhen)動、噪音等正常(cháng),再進💜行加載,查(cha)看各部件運行(háng)正常即可。
6. Professional personnel test machine, after circuit modification, manual control loading and unloading, first no-load operation for more than 10 minutes, detection of various indicators and vibration, noise and other normal, then load, check the normal operation of the components.
- 上一(yī)篇:旋轉(zhuǎn)滑片式 空氣壓(yā)縮機的工作原(yuan)理 [2025-12-15]
- 下一篇:如何(he)延長開山空壓(ya)機的壽命? [2025-12-15]



